NFPA 3: Commissioning and Integrated System Testing Handbook
| Description | Table of Contents | Sample Pages | Quantity Discounts |
Contents
Preface
Acknowledgments
About the Contributors
About the Editor
Part I
NFPA 3, Recommended Practice for Commissioning and Integrated Testing of Fire Protection and Life Safety Systems, 2012 Edition, with Commentary
1 Administration
1.1 Scope
1.2 Purpose
1.3 Application
1.4 New Technology
2 Referenced Publications
2.1 General
2.2 NFPA Publications
2.3 Other Publications
2.4 References for Extracts in Recommendations Sections
3 Definitions
3.1 General
3.2 NFPA Official Definitions
3.3 General Definitions
4 Qualifications of Commissioning Personnel
4.1 Applicability
4.2
Qualifications
5 Commissioning
5.1 General
5.2 Planning Phase
5.3 Design Phase
5.4 Construction Phase
5.5 Occupancy Phase
6 Integrated Systems Commissioning
6.1 General
6.2 Design Phase
6.3 Construction Phase
6.4 Occupancy Phase
6.5 Data Sharing Systems
7 Integrated System Testing
7.1 General
7.2 Test Frequency
7.3 Test Method
7.4 Testing Responsibility
8 Re-commissioning (Re-Cx) and Retro-commissioning (RCx) of Fire Protection and Life Safety Systems
8.1 General
8.2 Re-commissioning
8.3 Retro-commissioning
9 Commissioning Documentation and Forms
9.1 Documentation
9.2 Allowable Documents
9.3 Forms and Checklists
9.4
Document Retention
Annexes
A Explanatory Material
B Sample Basis of Design Narrative Report
C Sample Commissioning Documentation
D Referenced Publications
Part II
Commissioning Sample Project
1 Sample Commissioning Plan Overview
2 Commissioning Plan — ACME Corporate Offices
Index
Important Notices and Legal Disclaimers