ORDER FROM CATALOG

Item number Qty

CUSTOMER SALES
contact customer service
800-344-3555 Toll Free
617-770-3000 Int'l
8:30 am - 5:00pm (EST)
Monday - Friday

Canadian Customers
International Customers

 
PRODUCT DETAIL

NFPA 110: Standard for Emergency and Standby Power Systems, 2010 Edition

Choose another edition:
NFPA 110: Standard for Emergency and Standby Power Systems, 2010 Edition
Item # 11010
FormatListMember *Cart
Book$42.00$37.80Add
PDF$42.00$37.80Add

Give facilities reliable auxiliary power on demand with the updated 2010 NFPA 110.

If disruption of the normal utility supply occurs, readiness of emergency power is a key consideration in safeguarding building occupants. NFPA 110: Standard for Emergency and Standby Power Systems covers performance requirements for power systems providing an alternate source of electrical power in the event that the primary power source fails. Power systems covered include power sources, transfer equipment, controls, supervisory equipment, and all related electrical and mechanical auxiliary and accessory equipment needed to supply electrical power to the load terminals of the transfer equipment.

Among the changes in the 2010 edition of NFPA 110 are:

  • Clarification that the Standard is intended to apply to Level 1 or Level 2 emergency power supply systems (EPSSs)
  • Operation testing and routine maintenance provisions cover new and existing EPSSs.
  • Revised definitions of automatic transfer switch and non-automatic transfer switch for consistency with NFPA 111 and correlation with relevant product standards
  • Revised material on Level 1 and Level 2 EPSSs clarifies the function and applicability of each type of system
  • Differentiation of requirements for acceptance testing for new and unoccupied buildings versus those for existing occupied buildings and facilities. In addition, criteria for test duration, step-testing intervals, and required documentation have been modified.
  • Revised rules for operational test durations for diesel and spark-ignited prime movers. Also, the 36 month test requirement has been revised to clarify the maximum duration, the minimum acceptable EPS loading or operating condition, and the method of test initiation.

(Softbound, 37 pp., 2010)

Other Formats:
NFPA 110: Standard for Emergency and Standby Power Systems, 2010 Annotated PDF Edition

NFPA 70: National Electrical Code (NEC) Softbound and Handbook Set, 2014 Edition

NFPA 70: National Electrical Code (NEC) Softbound and Handbook Set, 2014 Edition

Get up-to-code with the 2014 NEC® Set! Save 15% on the must-have 2014 National Electrical Code® Softbound and NEC Handbook.

Item#: 70SBS14
List: $255.00
Set: $216.75
Member: $195.08

Add
CUSTOMERS ALSO BOUGHT

NFPA 99: Standard for Health Care Facilities, 2005 Edition

NFPA 99: Standard for Health Care Facilities, 2005 Edition
Item#: 9905
List: $66.50
Member: $59.85
Format: Book

Choose Format
YOU MIGHT ALSO LIKE

NFPA 110: Standard for Emergency and Standby Power Systems Handbook, 2013 Edition

NFPA 110: Standard for Emergency and Standby Power Systems Handbook, 2013 Edition
Item#: 11013A
List: $54.50
Member: $49.05
Format: PDF

Choose Format

Electrical Inspection Manual, 2014 Edition

Electrical Inspection Manual, 2014 Edition
Item#: 14NECCL
List: $146.95
Member: $132.26
Format: Book

Choose Format