The development of new or revised NFPA Codes, Standards, Guides, or Recommended Practices (NFPA Standards) will continue to take place in two principal stages. Under the current regulations, those stages are known as the "Proposal Stage" and the "Comment Stage". Under the new regulations, the "Proposal Stage" has been renamed the "Input Stage"; the "Comment Stage" will operate much like the "Comment Stage" in the current regulations.
A revision cycle begins with a call for the public to submit proposed revisions ("Public Input", formerly called "Public Proposals").
Public Input Stage
NFPA is now accepting Public Input on documents in the Annual 2014 revision cycle via our new online electronic submission system. To use the electronic submission system:
Comment Stage
Comments on NFPA documents should continue to be submitted via the Comment form (doc, 57 KB) or Comment form for the 2014 NEC® (doc, 55 KB) and returned to NFPA via e-mail, mail, or fax. Information about submitting comments via the new electronic submission system will be posted here at a later date.
Documents Reporting by Cycle |
||||
| Note: Public Input Dates may vary according to documents and schedules. For most up-to-date information, please check the specific document information page from the list of codes and standards and go to the Next Edition tab. |
||||
Annual 2012 Schedule |
Fall 2012 Schedule |
Annual 2013 NEC® Schedule |
||
| ROP | ROP | |||
| ROC | ||||
Fall 2013 Schedule |
Annual 2014 Schedule |
Fall 2014 Schedule |
||
Annual 2015 Schedule |
Fall 2015 Schedule |
|||
Reports on Proposals and Reports on Comments
Report on Comments (ROC)
Once the ROP becomes available, there is a 60-day comment period during which time anyone may submit a public comment on the proposed changes documented in the ROP. The committee or panel reconvenes at the end of the comment period and acts on all public comments. This committee or panel may also develop its own comments. As before, approval obtained via written ballot in accordance with NFPA's Regulations is required on all committee and panel actions. All of this information is compiled into a second Report, called the Report on Comments (ROC), which like the ROP, is published and made available for public review for a seven-week period.
The process of public input and review does not end with the publication of the ROP and ROC. For further information on ROP, ROC, and Notice of Intent to Make a Motion (NITMAM), see NFPA's Codes and Standards Making Process.
For general inquiries, please contact the Codes & Standards Administration Department.
| Current ROP/ROCs |
||
| ROP/ROC Archive (1-69) |
||
| ROP/ROC Archive (70) |
||
| ROP/ROC Archive (70B - 225) |
||
| ROP/ROC Archive (230 - 485) |
||
| ROP/ROC Archive (490 - 1127) |
||
| ROP/ROC Archive (1141 - 5000) |
||