PYR 1128: Standard Method of Fire Test for Flame Breaks
Current Edition: 2013 Next Edition: 2017

Alerts: Receive e-mail updates on this document Manage my alerts

Alert Me
Please confirm you would like to be alerted the next time we post new information about document .
Alerts will be sent to the e-mail address on your user profile:

Thank you for signing up for alerts.

Committee members: Sign-in to view your documents.
Buy This Edition
PYR 1128:
2013 Edition
Item #: 112813
List: from $35.00
Member: from $31.50

The next edition of this standard is now open for Public Input (formerly proposals).

Edition to display:
What is PYR 1128?
Official document scope
PYR 1128: Document Scope
1.1 Scope 1.1.1* This method of fire test for flame breaks is applicable to materials intended to be used as flame breaks complying with NFPA 1124, Code for the Manufacture, Transportation, Storage, and Retail Sales of Fireworks and Pyrotechnics Articles. 1.1.2 The performance of the flame break is determined by evaluating the ability of the flame break to resist the passage of fire during a standard fire exposure.
What does PYR 1128 address?
Table Of Contents.
Archived revision information
PYR 1128, 2013 Edition: Archived Revision Information
View archived proposals, comments and other records related to the development of this edition.
Read the archived revision information
PYR 1128, 2013 Edition: Archived Revision Information
Report on Proposals (ROP)
Report on Proposals (ROP)
Proposals can be submitted for text to be amended or included in NFPA Codes and Standards. Following the Call for Proposals period, the responsible Technical Committee or Panel holds a meeting to consider and act on all submitted proposals. The committee or panel may also develop its own proposals. A document known as the Report on Proposals (ROP) is prepared containing all the Public Proposals, Technical Committees' action on each Proposal, as well as all Committee-generated proposals. The ROP for the document in question is submitted for the approval of the responsible TC or Panel by a formal written ballot. If the ROP does not receive approval via written ballot in accordance with NFPA rules, the Report is returned to the committee for further consideration and is not published. If the necessary approval is received, the ROP is published in a compilation of Reports on Proposals issued by NFPA twice yearly for public review and comment, and the process continues to the next step. The ROP is published and widely distributed and anyone may download or request a copy.
The ROP Draft is appended to the ROP listed above.
ROP Meeting Notice
ROP Meeting Notice
Note: Please contact the appropriate staff liaison (listed on the Technical Committee tab) for information on attending an NFPA Technical Committee meeting as a guest. Read NFPA"s Regulations Governing Committee Projects (Section 3.3.3.3) for further information.
ROP Meeting Agenda
ROP Meeting Minutes
ROP Ballot
ROP Ballot
The ballots posted on this page are for public information only. Voting on ballots is permitted by committee members only. See NFPA Regulations Governing Committee Projects, Section 3.3.4.
Ballot (PDF, 813 KB)
Ballot Form (PDF, 39 KB) *
Ballot Final (PDF, 45 KB)
Report on Comments (ROC)
Report on Comments (ROC)
Once the ROP becomes available, there is a 60-day comment period during which time anyone may submit a public comment on the proposed changes documented in the ROP. The committee or panel reconvenes at the end of the comment period and acts on all public comments. This committee or panel may also develop its own comments. As before, approval obtained via written ballot in accordance with NFPA's Regulations is required on all committee and panel actions. All of this information is compiled into a second Report, called the Report on Comments (ROC), which like the ROP, is published and made available for public review for a seven-week period.
Report on Comments (ROC) (PDF, 727 KB)
ROC Meeting Notice
ROC Meeting Notice
Note: Please contact the appropriate staff liaison (listed on the Technical Committee tab) for information on attending an NFPA Technical Committee meeting as a guest. Read NFPA"s Regulations Governing Committee Projects (Section 3.3.3.3) for further information.
ROC Meeting Agenda
ROC Meeting Minutes
ROC Ballot
ROC Ballot
The ballots posted on this page are for public information only. Voting on ballots is permitted by committee members only. See NFPA Regulations Governing Committee Projects, Section 3.3.4.
Ballot (PDF, 300 KB)
Ballot Form (PDF, 52 KB) *
Ballot Final (PDF, 44 KB)
Other Ballots
Informational Ballot (PDF, 136 KB)

ADVERTISEMENT

Find a code or standard

Bottom blue line

Free access     NEC      Sparky the Fire Dog       NFPA Journal         Sprinklers       Wildland fires