NFPA 13D: Standard for the Installation of Sprinkler Systems in One- and Two-Family Dwellings and Manufactured Homes
Current Edition: 2013 Next Edition: 2016

Alerts: Receive e-mail updates on this document Manage my alerts

Alert Me
Please confirm you would like to be alerted the next time we post new information about document .
Alerts will be sent to the e-mail address on your user profile:

Thank you for signing up for alerts.

Committee members: Sign-in to view your documents.
Buy This Edition
NFPA 13D:
2013 Edition
Item #: 13D13
List: from $46.50
Member: from $41.85

The next edition of this standard is now open for Public Comment.

Edition to display:
What is NFPA 13D?
NFPA 13D: Document Scope
1.1* Scope. 1.1.1 This standard shall cover the design, installation, and maintenance of automatic sprinkler systems for protection against the fire hazards in one- and two-family dwellings and manufactured homes. 1.1.2 This standard assumes that the sprinkler system is designed to protect against a fire originating from a single ignition location.
NFPA 13D is a residential sprinkler design standard focused on one- and two- family dwellings and manufactured homes. The intent is to provide an affordable sprinkler system in homes while maintaining a high level of life safety. Official document scope
What does NFPA 13D address?
Requirements address automatic sprinkler system design, installation, and maintenance including numerous issues such as component listing, hydrostatic tests, sprinkler temperature ratings, design documentation, and hydraulic calculations.Table Of Contents.
NFPA 13D, 2013 Edition: Archived Revision Information
Report on Proposals (ROP)
Report on Proposals (ROP)
Proposals can be submitted for text to be amended or included in NFPA Codes and Standards. Following the Call for Proposals period, the responsible Technical Committee or Panel holds a meeting to consider and act on all submitted proposals. The committee or panel may also develop its own proposals. A document known as the Report on Proposals (ROP) is prepared containing all the Public Proposals, Technical Committees' action on each Proposal, as well as all Committee-generated proposals. The ROP for the document in question is submitted for the approval of the responsible TC or Panel by a formal written ballot. If the ROP does not receive approval via written ballot in accordance with NFPA rules, the Report is returned to the committee for further consideration and is not published. If the necessary approval is received, the ROP is published in a compilation of Reports on Proposals issued by NFPA twice yearly for public review and comment, and the process continues to the next step. The ROP is published and widely distributed and anyone may download or request a copy.
ROP Meeting Notice
ROP Meeting Notice
Note: Please contact the appropriate staff liaison (listed on the Technical Committee tab) for information on attending an NFPA Technical Committee meeting as a guest. Read NFPA"s Regulations Governing Committee Projects (Section 3.3.3.3) for further information.
ROP Meeting Agenda
ROP Meeting Minutes
ROP Ballot
ROP Ballot
The ballots posted on this page are for public information only. Voting on ballots is permitted by committee members only. See NFPA Regulations Governing Committee Projects, Section 3.3.4.
Report on Comments (ROC)
Report on Comments (ROC)
Once the ROP becomes available, there is a 60-day comment period during which time anyone may submit a public comment on the proposed changes documented in the ROP. The committee or panel reconvenes at the end of the comment period and acts on all public comments. This committee or panel may also develop its own comments. As before, approval obtained via written ballot in accordance with NFPA's Regulations is required on all committee and panel actions. All of this information is compiled into a second Report, called the Report on Comments (ROC), which like the ROP, is published and made available for public review for a seven-week period.
ROC Meeting Notice
ROC Meeting Notice
Note: Please contact the appropriate staff liaison (listed on the Technical Committee tab) for information on attending an NFPA Technical Committee meeting as a guest. Read NFPA"s Regulations Governing Committee Projects (Section 3.3.3.3) for further information.
Technical Correlating Committee, Telephone/Web Conference, December 6, 2011
ROC Meeting Agenda
ROC Meeting Minutes
ROC Ballot
ROC Ballot
The ballots posted on this page are for public information only. Voting on ballots is permitted by committee members only. See NFPA Regulations Governing Committee Projects, Section 3.3.4.
Motions Committee Report (NITMAM)
Motions Committee Report (NITMAM)
Proposed NFPA documents will be presented for action at the applicable Annual (June) Association Technical Meeting only when proper Amending Motions (Notice of Intent to Make a Motion - NITMAM) have been certified by the Motions Committee of the Standards Council as a proper amending motion. Documents that receive no motions will not be presented at the meeting and instead will be forwarded directly to the NFPA Standards Council for action on issuance. More about the codes and standards making process including NITMAM.
No NITMAMs
Other Ballots
TIA Ballot
Association Technical Meeting
Consent document not presented at Association Technical Meeting. Document issuance by Standards Council: May 29, 2012
Standards Council Decisions
Archived revision information
NFPA 13D, 2013 Edition: Archived Revision Information
View archived proposals, comments and other records related to the development of this edition.
Read the archived revision information
Tentative Interim Amendment (TIA)
Tentative Interim Amendment (TIA)
Tentative Interim Amendments (TIAs) are amendments to an NFPA document processed in accordance with Section 5 of the Regulations Governing Committee Projects. They have not gone through the entire codes and standards-making process of being published in a ROP and ROC for review and comment. TIAs are effective only between editions of the Document. A TIA automatically becomes a proposal of the proponent for the next edition of the Document, as such is then subject to all of the procedures of the codes and standards making process. TIAs are published in NFPA News , NFCSS, and any further distribution of the document after being issued by the Standards Council.

Requests for TIAs shall be clearly worded to provide the recommended revision and the reason as to why it is of an emergency nature requiring prompt action. Submissions shall be in writing, addressed to the Standards Council Secretary, NFPA, 1 Batterymarch Park, Quincy, MA 02169-7471. The submitter must also provide the appropriate endorsments in writing of two members of the applicable technical committee or technical correlating committee. For further information on submitting a TIA, please contact Codes and Standards Administration.

TIA 13-2 (issued 8/9/2012) (PDF, 19 KB)
TIA 13-1 (issued 8/9/2012) (PDF, 47 KB)
Standards Council Decisions
View the document online (read only)
Additional Information
Articles and Reports

ADVERTISEMENT

Find a code or standard

Bottom blue line

Free access     NEC      Sparky the Fire Dog        NFPA Conference & Expo         NFPA Journal         Sprinklers       Wildland fires