NFPA 295: Standard for Wildfire Control
Current Edition: 1998 Next Edition: Withdrawn

Alerts: Receive e-mail updates on this document Manage my alerts

Alert Me
Please confirm you would like to be alerted the next time we post new information about document .
Alerts will be sent to the e-mail address on your user profile:

Thank you for signing up for alerts.

Committee members: Sign-in to view your documents.
Buy This Edition
NFPA 295:
1998 Edition
Item #: 29598
List: $42.00
Member: $37.80

cartADD TO CART
Format: PDF
This document was withdrawn in Annual 2003 and incorporated into NFPA 1143.
Edition to display:
What is NFPA 295?
NFPA 295: Document Scope
Presents fundamental information to fire departments in the control of wildfire burning in natural and other vegatative fuels.
Official document scope
What does NFPA 295 address?
Table Of Contents.
NFPA 295, 1998 Edition: Archived Revision Information
Report on Proposals (ROP)
Report on Proposals (ROP)
Proposals can be submitted for text to be amended or included in NFPA Codes and Standards. Following the Call for Proposals period, the responsible Technical Committee or Panel holds a meeting to consider and act on all submitted proposals. The committee or panel may also develop its own proposals. A document known as the Report on Proposals (ROP) is prepared containing all the Public Proposals, Technical Committees' action on each Proposal, as well as all Committee-generated proposals. The ROP for the document in question is submitted for the approval of the responsible TC or Panel by a formal written ballot. If the ROP does not receive approval via written ballot in accordance with NFPA rules, the Report is returned to the committee for further consideration and is not published. If the necessary approval is received, the ROP is published in a compilation of Reports on Proposals issued by NFPA twice yearly for public review and comment, and the process continues to the next step. The ROP is published and widely distributed and anyone may download or request a copy.
Report on Comments (ROC)
Report on Comments (ROC)
Once the ROP becomes available, there is a 60-day comment period during which time anyone may submit a public comment on the proposed changes documented in the ROP. The committee or panel reconvenes at the end of the comment period and acts on all public comments. This committee or panel may also develop its own comments. As before, approval obtained via written ballot in accordance with NFPA's Regulations is required on all committee and panel actions. All of this information is compiled into a second Report, called the Report on Comments (ROC), which like the ROP, is published and made available for public review for a seven-week period.
Archived revision information
NFPA 295, 1998 Edition: Archived Revision Information
View archived proposals, comments and other records related to the development of this edition.
Read the archived revision information

Find a code or standard

Related Products
Fire Protection Handbook, 2008 Edition
Item #: FPH2008
List: from $245.00
Member: from $220.50


New U.S./Canadian Membership
Item #: MBRR
List: from $165.00
Member: from $165.00


NFPA 1906: Standard for Wildland Fire Apparatus, 2001 Edition
Item #: 190601
List: $54.50
Member: $49.05

cartADD TO CART
Format: PDF
Bottom blue line

Free access     NEC      Sparky the Fire Dog        NFPA Conference & Expo         NFPA Journal         Sprinklers       Wildland fires