NFPA 59A: Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG)
Current Edition: 2013 Next Edition: 2016

Alerts: Receive e-mail updates on this document Manage my alerts

Alert Me
Please confirm you would like to be alerted the next time we post new information about document .
Alerts will be sent to the e-mail address on your user profile:

Thank you for signing up for alerts.

Committee members: Sign-in to view your documents.
Buy This Edition
NFPA 59A:
2013 Edition
Item #: 59A13
List: from $46.50
Member: from $41.85

Edition to display:
What is NFPA 59A?
NFPA 59A: Document Scope
1.1.1 This standard shall apply to the following: (1) Facilities that liquefy natural gas (2) Facilities that store, vaporize, transfer, and handle liquefied natural gas (LNG) (3) The training of all personnel involved with LNG (4) The design, location, construction, maintenance, and operation of all LNG facilities 1.1.2 This standard shall not apply to the following: (1) Frozen ground containers (2) Portable storage containers stored or used in buildings (3) All LNG vehicular applications, including fueling of LNG vehicles
Official document scope
What does NFPA 59A address?
Table Of Contents.
NFPA 59A, 2013 Edition: Archived Revision Information
Report on Proposals (ROP)
Report on Proposals (ROP)
Proposals can be submitted for text to be amended or included in NFPA Codes and Standards. Following the Call for Proposals period, the responsible Technical Committee or Panel holds a meeting to consider and act on all submitted proposals. The committee or panel may also develop its own proposals. A document known as the Report on Proposals (ROP) is prepared containing all the Public Proposals, Technical Committees' action on each Proposal, as well as all Committee-generated proposals. The ROP for the document in question is submitted for the approval of the responsible TC or Panel by a formal written ballot. If the ROP does not receive approval via written ballot in accordance with NFPA rules, the Report is returned to the committee for further consideration and is not published. If the necessary approval is received, the ROP is published in a compilation of Reports on Proposals issued by NFPA twice yearly for public review and comment, and the process continues to the next step. The ROP is published and widely distributed and anyone may download or request a copy.
ROP Meeting Notice
ROP Meeting Notice
Note: Please contact the appropriate staff liaison (listed on the Technical Committee tab) for information on attending an NFPA Technical Committee meeting as a guest. Read NFPA"s Regulations Governing Committee Projects (Section 3.3.3.3) for further information.
ROP Meeting Agenda
ROP Meeting Minutes
ROP Ballot
ROP Ballot
The ballots posted on this page are for public information only. Voting on ballots is permitted by committee members only. See NFPA Regulations Governing Committee Projects, Section 3.3.4.
Ballot (PDF, 3 MB)
Ballot Circulation (PDF, 83 KB)
Ballot Final (PDF, 192 KB)
Ballot Supplemental (PDF, 257 KB)
Report on Comments (ROC)
Report on Comments (ROC)
Once the ROP becomes available, there is a 60-day comment period during which time anyone may submit a public comment on the proposed changes documented in the ROP. The committee or panel reconvenes at the end of the comment period and acts on all public comments. This committee or panel may also develop its own comments. As before, approval obtained via written ballot in accordance with NFPA's Regulations is required on all committee and panel actions. All of this information is compiled into a second Report, called the Report on Comments (ROC), which like the ROP, is published and made available for public review for a seven-week period.
ROC Meeting Notice
ROC Meeting Notice
Note: Please contact the appropriate staff liaison (listed on the Technical Committee tab) for information on attending an NFPA Technical Committee meeting as a guest. Read NFPA"s Regulations Governing Committee Projects (Section 3.3.3.3) for further information.
ROC Meeting Agenda
ROC Meeting Minutes
ROC Ballot
ROC Ballot
The ballots posted on this page are for public information only. Voting on ballots is permitted by committee members only. See NFPA Regulations Governing Committee Projects, Section 3.3.4.
Ballot (PDF, 480 KB)
Ballot Form (PDF, 159 KB)
Ballot Circulation (PDF, 64 KB)
Ballot Final (PDF, 82 KB)
Motions Committee Report (NITMAM)
Motions Committee Report (NITMAM)
Proposed NFPA documents will be presented for action at the applicable Annual (June) Association Technical Meeting only when proper Amending Motions (Notice of Intent to Make a Motion - NITMAM) have been certified by the Motions Committee of the Standards Council as a proper amending motion. Documents that receive no motions will not be presented at the meeting and instead will be forwarded directly to the NFPA Standards Council for action on issuance. More about the codes and standards making process including NITMAM.
Motions Committee Report (PDF, 599 KB)
Amendment Ballot
Ballot, 59A-1 (PDF, 175 KB)
Ballot Form, 59A-1 (, 25 KB)
TIA Ballot
Ballot, TIA Log No 1090 (PDF, 197 KB)
Association Technical Meeting
Final Results (PDF, 99 KB)
Transcript (PDF, 27 KB)
Archived revision information
NFPA 59A, 2013 Edition: Archived Revision Information
View archived proposals, comments and other records related to the development of this edition.
Read the archived revision information
Tentative Interim Amendment (TIA)
Tentative Interim Amendment (TIA)
Tentative Interim Amendments (TIAs) are amendments to an NFPA document processed in accordance with Section 5 of the Regulations Governing Committee Projects. They have not gone through the entire codes and standards-making process of being published in a ROP and ROC for review and comment. TIAs are effective only between editions of the Document. A TIA automatically becomes a proposal of the proponent for the next edition of the Document, as such is then subject to all of the procedures of the codes and standards making process. TIAs are published in NFPA News , NFCSS, and any further distribution of the document after being issued by the Standards Council.

Requests for TIAs shall be clearly worded to provide the recommended revision and the reason as to why it is of an emergency nature requiring prompt action. Submissions shall be in writing, addressed to the Standards Council Secretary, NFPA, 1 Batterymarch Park, Quincy, MA 02169-7471. The submitter must also provide the appropriate endorsments in writing of two members of the applicable technical committee or technical correlating committee. For further information on submitting a TIA, please contact Codes and Standards Administration.

TIA 13-2, Reference: Table 15.8.4.2 (issued 3/3/2014) (PDF, 22 KB)
Formal Interpretations (FIs)
Formal Interpretations (FIs)
Formal Interpretations (FIs) provide formal explanations of the meaning or intent of any specific provision or provisions of any document in accordance with Section 6 of the Regulations Governing Committee Projects.

Download a Formal Interpretation request form (doc, 58 KB).

For previously issued Formal Interpretations (not listed below), e-mail the NFPA Library, or call +1 617 984-7445, or fax +1 617 984-7060.

Formal Interpretations (PDF, 116 KB)
View the document online (read only)

Find a code or standard

Related Products

NFPA 52: Vehicular Gaseous Fuel Systems Code, 2013 Edition
Item #: 5213
List: from $46.50
Member: from $41.85


NFPA 58: LP-Gas Code Handbook, 2014 Edition
Item #: 58HB14
List: from $138.00
Member: from $124.20


NFPA 54: National Fuel Gas Code, 2012 Edition
Item #: 5412
List: from $54.50
Member: from $49.05

Bottom blue line

Free access     NEC      Sparky the Fire Dog        NFPA Conference & Expo         NFPA Journal         Sprinklers       Wildland fires