Edition to display:
What is NFPA 780?
NFPA 780 provides lightning protection system installation requirements to safeguard people and property from fire risk and related hazards associated with lightning exposure.
Official document scope
NFPA 780: Document Scope
1.1 Scope. 1.1.1 This document shall cover traditional lightning protection system installation requirements for the following: (1) Ordinary structures (2) Miscellaneous structures and special occupancies (3) Heavy-duty stacks
(4) Watercraft (5) Structures containing flammable vapors, flammable gases, or liquids that give off flammable vapors 1.1.2* This document shall not cover lightning protection system installation requirements for electric generating, transmission, and distribution systems. 1.1.3 This document shall not cover lightning protection system installation requirements for early streamer emission systems or charge dissipation systems.
What does NFPA 780 address?
This Standard covers traditional lightning protection system installation requirements for ordinary structures; miscellaneous structures and special occupancies; heavy-duty stacks; watercraft; wind turbines; structures housing explosive materials; and structures containing flammable vapors, flammable gases, or liquids that give off flammable vapors.
Table Of Contents.
Archived revision information

NFPA 780, 2014 Edition: Archived Revision Information
View archived proposals, comments and other records related to the development of this edition.
Read the archived revision information
NFPA 780, 2014 Edition: Archived Revision Information
Report on Proposals (ROP)
Report on Proposals (ROP)
Proposals can be submitted for text to be amended or included in NFPA Codes and Standards. Following the Call for Proposals period, the responsible Technical Committee or Panel holds a meeting to consider and act on all submitted proposals. The committee or panel may also develop its own proposals. A document known as the Report on Proposals (ROP) is prepared containing all the Public Proposals, Technical Committees' action on each Proposal, as well as all Committee-generated proposals. The ROP for the document in question is submitted for the approval of the responsible TC or Panel by a formal written ballot. If the ROP does not receive approval via written ballot in accordance with NFPA rules, the Report is returned to the committee for further consideration and is not published. If the necessary approval is received, the ROP is published in a compilation of Reports on Proposals issued by NFPA twice yearly for public review and comment, and the process continues to the next step. The ROP is published and widely distributed and anyone may download or request a copy.
ROP Meeting Notice
ROP Meeting Notice
Note: Please contact the appropriate staff liaison (listed on the Technical Committee tab) for information on attending an NFPA Technical Committee meeting as a guest. Read NFPA"s
Regulations Governing Committee Projects (Section 3.3.3.3) for further information.
Supplemental ROP, March 29, 2012 Telephone/Web Meeting
ROP Meeting Agenda
ROP Meeting Minutes
ROP Ballot
Report on Comments (ROC)
Report on Comments (ROC)
Once the ROP becomes available, there is a 60-day comment period during which time anyone may submit a public comment on the proposed changes documented in the ROP. The committee or panel reconvenes at the end of the comment period and acts on all public comments. This committee or panel may also develop its own comments. As before, approval obtained via written ballot in accordance with NFPA's Regulations is required on all committee and panel actions. All of this information is compiled into a second Report, called the Report on Comments (ROC), which like the ROP, is published and made available for public review for a seven-week period.
ROC Meeting Notice
ROC Meeting Notice
Note: Please contact the appropriate staff liaison (listed on the Technical Committee tab) for information on attending an NFPA Technical Committee meeting as a guest. Read NFPA"s
Regulations Governing Committee Projects (Section 3.3.3.3) for further information.
ROC Meeting Agenda
ROC Meeting Minutes
ROC Ballot
Motions Committee Report (NITMAM)
Motions Committee Report (NITMAM)
Proposed NFPA documents will be presented for action at the applicable Annual (June) Association Technical Meeting only when proper Amending Motions (Notice of Intent to Make a Motion - NITMAM) have been certified by the Motions Committee of the Standards Council as a proper amending motion. Documents that receive no motions will not be presented at the meeting and instead will be forwarded directly to the NFPA Standards Council for action on issuance.
More about the codes and standards making process including NITMAM.
No NITMAMs
Association Technical Meeting
Consent document not presented at Association Technical Meeting. Document issuance: 5/28/2013
Additional Committee Information
View the document online (read only)
Articles and Reports