|
Document Number
|
Document Title (links will take you to the Document Information page where you can download the ROP/ROC file)
|
Action
Type*
|
|
10
|
Standard for Portable Fire Extinguishers |
P
|
|
11
|
Standard for Low-, Medium-, and High-Expansion Foam |
P
|
|
13E
|
Recommended Practice for Fire Department Operations in Properties Protected by Sprinkler and Standpipe Systems |
P
|
|
14
|
Standard for the Installation of Standpipes and Hose Systems
|
P
|
|
18
|
Standard on Wetting Agents |
P
|
|
37
|
Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines |
P
|
|
45
|
Standard on Fire Protection for Laboratories Using Chemicals
|
P
|
|
53
|
Recommended Practice on Materials, Equipment, and Systems Used in Oxygen-Enriched Atmospheres |
P
|
|
70B
|
Recommended Practice for Electrical Equipment Maintenance
|
P
|
|
91
|
Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids |
P
|
|
120
|
Standard for Fire Prevention and Control in Coal Mines |
P
|
|
122
|
Standard for Fire Prevention and Control in Metal/Nonmetal Mining and Metal Mineral Processing Facilities
|
P
|
|
211
|
Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
|
P
|
|
214
|
Standard on Water-Cooling Towers
|
P
|
|
276
|
Standard Method of Fire Tests for Determining the Heat Release Rate of Roofing Assemblies with Combustible Above-Deck Roofing Components
|
N
|
|
326
|
Standard for the Safeguarding of Tanks and Containers for Entry, Cleaning, or Repair
|
P
|
|
329
|
Recommended Practice for Handling Releases of Flammable and Combustible Liquids and Gases
|
P
|
|
405
|
Standard for the Recurring Proficiency of Airport Fire Fighters
|
P
|
|
408
|
Standard for Aircraft Hand Portable Fire Extinguishers
|
P
|
|
409
|
Standard on Aircraft Hangars
|
P
|
|
495
|
Explosive Materials Code |
P
|
|
505
|
Fire Safety Standard for Powered Industrial Trucks Including Type Designations, Areas of Use, Conversions, Maintenance, and Operations |
P
|
|
551
|
Guide for the Evaluation of Fire Risk Assessments |
P
|
|
701
|
Standard Methods of Fire Tests for Flame Propagation of Textiles and Films |
P
|
|
750
|
Standard on Water Mist Fire Protection Systems |
P
|
|
804
|
Standard for Fire Protection for Advanced Light Water Reactor Electric Generating Plants |
P
|
|
805
|
Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants |
P
|
|
806
|
Performance-Based Standard for Fire Protection for Advanced Nuclear Reactor Electric Generating Plants Change Process |
N
|
|
850
|
Recommended Practice for Fire Protection for Electric Generating Plants and High Voltage Direct Current Converter Stations |
P
|
|
851
|
Recommended Practice for Fire Protection for Hydroelectric Generating Plants |
P
|
|
853
|
Standard for the Installation of Stationary Fuel Cell Power Systems |
P
|
|
914
|
Code for Fire Protection of Historic Structures |
P
|
|
1003
|
Standard for Airport Fire Fighter Professional Qualifications |
P
|
|
1035
|
Standard for Professional Qualifications for Public Fire and Life Safety Educator |
P
|
|
1150
|
Standard on Foam Chemicals for Fires in Class A Fuels |
P
|
|
1407
|
Standard for Fire Service Rapid Intervention Crews |
N
|
|
1452
|
Guide for Training Fire Service Personnel to Conduct Dwelling Fire Safety Surveys |
P
|
|
1581
|
Standard on Fire Department Infection Control Program |
P
|
|
1600
|
Standard on Disaster/Emergency Management and Business Continuity Programs |
C
|
|
1801
|
Standard on Thermal Imagers for the Fire Service |
N
|
|
1952
|
Standard on Surface Water Operations Protective Clothing and Equipment |
N
|
|
2010
|
Standard for Fixed Aerosol Fire-Extinguishing Systems |
P
|
|
Document Number
|
The following documents appeared in the Report on Proposals but received no comments, therefore, have no Report on Comments: |
Action
Type*
|
|
255
|
Standard Method of Test of Surface Burning Characteristics of Building Materials |
W
|
|
410
|
Standard on Aircraft Maintenance |
P
|
|
422
|
Guide for Aircraft Accident/Incident Response Assessment
|
P
|
|
423
|
Standard for Construction and Protection of Aircraft Engine Test Facilities |
P
|
|
498
|
Standard for Safe Havens and Interchange Lots for Vehicles Transporting Explosives |
R
|
|
520
|
Standard on Subterranean Spaces |
P
|
|
600
|
Standard on Industrial Fire Brigades |
R
|
|
601
|
Standard for Security Services in Fire Loss Prevention |
R
|
|
900
|
Building Energy Code |
P
|
|
1201
|
Standard for Providing Emergency Services to the Public
(will be redesignated as NFPA 1201, Standard for Providing Fire and Emergency Services to the Public ) |
C
|
|
1250
|
Recommended Practice in Emergency Service Organization Risk Management
(will be redesignated as NFPA 1250, Recommended Practice in Fire and Emergency Services Organization Risk Management ) |
P
|
|
1410
|
Standard on Training for Initial Emergency Scene Operations |
P
|
|
1620
|
Recommended Practice for Pre-Incident Planning
(will be redesignated as NFPA 1620, Standard for Pre-Incident Planning ) |
C
|
|
1931
|
Standard for Manufacturer's Design of Fire Department Ground Ladders |
P
|
|
1932
|
Standard on Use, Maintenance, and Service Testing of In-Service Fire Department Ground Ladders |
P
|
|
1936
|
Standard on Powered Rescue Tools |
P
|
|
Document Number
|
The following documents changed reporting cycles as indicated below: |
|
|
204
|
Standard for Smoke and Heat Venting
The Technical Committee Report on NFPA 204, Standard for Smoke and Heat Venting, is not included in this Report on Comments for action at this meeting. The Committee has requested more time to develop a position on the design issues involving sprinklers in buildings equipped with smoke and heat vents. The document will instead report in the Report on Comments for the A2010 ROC cycle.
|
|
|
1977
|
Standard on Protective Clothing and Equipment for Wildland Fire Fighting
The Technical Committee Report on NFPA 1977, Standard on Protective Clothing and Equipment for Wildland Fire Fighting, is not included in this Report on Comments for action at this meeting. The Committee has requested more time because of new material submitted during the F2009 ROC. The document will instead report in the Report on Proposals for the F2010 ROP cycle, but will not reopen the proposal closing date. |
|